The concession has two independent electrical connections (Grau Roig- FEDA side and Pas de la Casa- SERCENSA side) that feed the transformer stations. It has four generators and uninterrupted power supply systems via UPS that guarantee the electricity supply and the operation of the signalling and safety systems.